解决水闸工程设计中非线性规划问题的新途径
New Way to Solve Problems of Nonlinear Programming in Sluice Project Design
-
摘要: 借助遗传算法,在传统的计算模型基础上建立两个非线性规划模型,第1个模型计算收缩水深,判定是否需设置消力池,第2个模型计算消力池深度。通过模型计算,和传统的计算方法相比,结果一致,方法可行。Abstract: By means of genetic algorithm,two nonlinear programming models were established on the basis of traditional calculation model.The first model calculated the shrinkage water depth to determine whether stilling basin was needed.The second model calculated depth of stilling basin.Through model calculation,compared with traditional calculation method,the result was consistent,and method was feasible.