Design of Small Lift Irrigation Station in Hilly Area of Sichuan
-
摘要:
根据作物的用水定额和灌溉面积等计算灌溉需水量,确定了小型提灌站泵的流量、扬程等相关参数,通过管径计算确定了输水管道直径,并根据相关参数设计了小型提灌站,为基层工作人员提供借鉴参考。
Abstract:Irrigation water demand was calculated according to water quota and irrigation area of crops.Flow, head and other relevant parameters of pump of small lifting irrigation station were determined.Diameter of water transmission pipeline was determined through pipe diameter calculation.Small lifting irrigation station was designed according to relevant parameters, so as to provide reference for grass-roots staff.
-
Keywords:
- hilly area /
- small lift irrigation station /
- water hammer /
- irrigation
-
表 1 扬程计算结果
Table 1. Calculation results of head
单位:m 净扬程$ {H}_{净} $ 水力损失$ {h_f} $ 局部损失$ {h_j} $ 总扬程$ H $ 145.4 52.10 7.14 204.64 表 2 水锤压力计算结果
Table 2. Calculation results of water hammer pressure
机组运行情况 导叶开度 △Hr/m 开始 终了 关机 τ0 0 68.63 1 0 135.07 开机 τ0 1 46.42 0 1 80.36 注:τ0为导叶初始开度 表 3 水泵性能参数
Table 3. Performance parameters of water pump
流量$ Q $/
(m3·h−1)扬程
$ H $/m功率
$ P $/kW转速$ n $/
(r·min−1)气蚀余量
$ NPSH $/m40 209 37 2 900 2.0 -
[1] 陈涌城,杜玉柱,耿安锋.输配水管道沿程水头损失计算方法探讨[J].给水排水,2009,35(11):109-111. doi: 10.3969/j.issn.1002-8471.2009.11.030CHEN Yongcheng,DU Yuzhu,GENG Anfeng.Discussion on calculation method of the frictional head loss in the water transmission and distribution pipe[J].Water & Wastewater Engineering,2009,35(11):109-111. doi: 10.3969/j.issn.1002-8471.2009.11.030 [2] 卢珍,曾文明,李光辉,等.提灌站水泵设计选型研究及典型案例分析[J].中国农村水利水电,2020(11):107- 111,117. doi: 10.3969/j.issn.1007-2284.2020.11.020LU Zhen,ZENG Wenming,LI Guanghui,et al.Research on the pump design and selection of pump stations and typical cases[J].China Rural Water and Hydropower,2020(11):107- 111,117. doi: 10.3969/j.issn.1007-2284.2020.11.020 [3] 郭小春.水泵设计选型研究及案例分析[J].给水排水,2018,44(12):89-92. doi: 10.3969/j.issn.1002-8471.2018.12.018 [4] 樊建军,梁志君,董毅,等.水泵选型与运行模式对变频调速供水系统能耗的影响[J].中国农村水利水电,2007(7):25-27. doi: 10.3969/j.issn.1007-2284.2007.07.007FAN Jianjun,LIANG Zhijun,DONG Yi,et al.Influence of pump type-selection and operating mode on energy-consumption of frequency-conversion and speed-adjusting water supply system[J].China Rural Water and Hydropower,2007(7):25-27. doi: 10.3969/j.issn.1007-2284.2007.07.007 [5] 郭伟奇,吴建华,李娜,等.长距离重力流输水系统水锤防护措施研究[J].中国农村水利水电,2018(11):124- 126,130. doi: 10.3969/j.issn.1007-2284.2018.11.024GUO Weiqi,WU Jianhua,LI Na,et al.Research on water hammer protection measures for long-distance gravity flow water delivery system[J].China Rural Water and Hydropower,2018(11):124- 126,130. doi: 10.3969/j.issn.1007-2284.2018.11.024 [6] 刘玉静.大高差重力流多级减压输水管道水锤防护技术研究[D].西安: 长安大学, 2018.LIU Yujing.Water hammer protection technology of multi-stage decompression water pipeline with large height difference gravity flow[D].Xi’an: Chang'an University, 2018. [7] 戴江力.某灌区输水干管水力和水锤计算及水锤防护研究[J].水利科技与经济,2021,27(1):27-33. doi: 10.3969/j.issn.1006-7175.2021.01.005 [8] 张卫华.停泵水锤与水力计算简析[J].通用机械,2020(6):47-49.ZHANG Weihua.Simple analysis on pumping-off water hammer and hydraulic calculation[J].General Machinery,2020(6):47-49. [9] 赵伟明,李桂元,徐义军.湖南省小型提灌站设计选型研究[J].湖南水利水电,2012(4):14- 15,20. doi: 10.3969/j.issn.1009-4229.2012.04.007 [10] 李明桥,刘建华,赵妍.供水泵站工程水泵选型计算实例分析[J].西北水电,2021(4):69-71. doi: 10.3969/j.issn.1006-2610.2021.04.016